en
Select category
London

Gas-fired power plant

Gas-fired power plant
1 / 4
Gas-fired power plant - photo 1 Gas-fired power plant - photo 2 Gas-fired power plant - photo 3 Gas-fired power plant - photo 4
Renewed: 25 January 2024, 10:08 ID: 3908
£ 300,000/kit
Flagma member since 15 October 2021
Драгун Александр
коммерческий директор

Description

The GGP-ASK 250 gas generator power plant is designed for the generation of electrical power from industrial and municipal waste. In terms of pollutant emissions, the gas generator power plant is designed and manufactured to meet all environmental requirements.
Our design department has studied the existing small gas generator power plants and has taken the shortcomings of these models into account in the development and design of the GGP-ASK 250.
With this in mind, our company offers a new, environmentally friendly reactor plant technology with a reverse gasification process for the generation of power gas, which is used to power gas-fired generating sets (GFGUs).
The gas generator power plant is manufactured in a 20 ft container type, allowing the use of standard road, rail and sea transport vehicles.
The GGP-ASK 250 gas-fired power plant can operate both independently and in connection with the national grid at a feed-in tariff. The software provides the necessary parameters and accurate synchronisation with the electricity grid. The control system has remote notification functionality to the operator of any errors and provides automatic emergency shutdown with disconnection from the power grid, should they occur.
The GGP-ASK 250 is the perfect way to electrify remote production and mining sites that require an independent power supply, or to reduce peak loads on an existing connection to the public power grid.

The owner of the ad has the most up-to-date information.

Similar ads

7
Equipment and technologies for processing waste from power plants into concrete products.
Equipment and technologies for processing waste from power plants into concrete products. - photo 1
Equipment and technologies for processing waste from power plants into concrete products. - photo 2
+3 photo
Equipment and technologies for processing waste from power plants into concrete products. - photo 3
Price
£ 100,000/pc
Scandinavian engineering stone - SCANDINAVIAN-ROCK Circular economy without waste and harm to the environment. Transform all industrial, municipal and mining waste, carbon-free, using all by-products using the revolutionary Nu-Cement process and the "Artificial Rock" process. Every ton of waste...
+125 ads
5 Oct 2023
6
Used diesel power plant Hyundai Himsen 9H21 / 32 with a capacity of 57.8 MW
Used diesel power plant Hyundai Himsen 9H21 / 32 with a capacity of 57.8 MW - photo 1
Used diesel power plant Hyundai Himsen 9H21 / 32 with a capacity of 57.8 MW - photo 2
+2 photo
Used diesel power plant Hyundai Himsen 9H21 / 32 with a capacity of 57.8 MW - photo 3
Price
£ 1,000/pc
Used Hyundai Himsen 9H21/32 57.8 MW diesel power plant an unrivaled asset in excellent condition. It is a complete solution for your requirements. Equipment parameters: Operating hours: 6600 (average) Last service: 6,000 hours. (HHI manuals) Frequency: 60 Hz (can be changed to 50 Hz with the...
+125 ads
5 Oct 2023
14
Used gas turbine power plant General Elektris (USA) 77 MW, 2019
Used gas turbine power plant General Elektris (USA) 77 MW, 2019 - photo 1
Used gas turbine power plant General Elektris (USA) 77 MW, 2019 - photo 2
+10 photo
Used gas turbine power plant General Elektris (USA) 77 MW, 2019 - photo 3
Price
£ 1,000/pc
Used gas turbine power plant General Elektric (USA) 77 MW. Made in 2011. (container version) Fuel - natural gas. Operating time - 1000 hours. Technical description of the equipment: Power plant with gas turbine 77 MW at the generator outlet. Turbine and generator manufacturer: GE Year of...
+125 ads
5 Oct 2023
Show more
Works by Flagma since 15 October 2021
Драгун Александр
коммерческий директор
See more ads in the category Gas generators, electric power plants
Contact the company
Драгун Александр
Коммерческий директор
By phone
Say, that you found an ad on Flagma
Safety rules: Do not agree to prepayment if you are not sure about the reliability of the user.
Write a message
АСК ТехниксБел, ООО Драгун Александр, Коммерческий директор
Gas-fired power plant
£ 300,000/kit ID: 3908
Select category
×