1. Subject of the proposal
1125 roof tile forming machine
2. Packing
1). Shipping container line
2). Goods can be loaded into a 40 foot container.
3). Type of packaging: Plastic film packaging, spare parts and small parts are packed in cardboard boxes.
3. Delivery Time
30-35 business days (not including holidays and weekends of the PRC) from the moment of confirmation of acceptance of the order, deposit receipt and approval of technical details.
4. Payment Terms
30% prepayment by T / T (wire transfer), 70% payment by T / T (wire transfer) before shipment.
5. Quality Assurance
The quality guarantee is valid for 15 months from the date of shipment of the goods, the warranty for repair services is valid indefinitely.
Spare parts will be provided free of charge during the entire period of the quality guarantee, with the exception of breakdowns caused by the fault of the buyer. After the expiration of the quality guarantee, only the cost of spare parts will be charged.
Unlimited health advice and free technical support.
6. Assembly (on request)
1). Installation cost $ 100 per day (including flight days).
2). The buyer must provide transportation from the place of residence to the place of work, the cost of insurance outside of China, solve the problems of the language barrier, pay for accommodation (at least a three-star hotel with heating), pay for the flight outside of China (round trip), etc.
3). The machine can be started according to the instructions, assembled and fully tested under operating conditions.
7. Full photo of the car
8. Profile drawing
1) Material: galvanized sheet steel roll,
2) Material thickness: 0.4-0.8 mm
3) Steel strength: Q235
Note:
◆ To prevent influence on the quality of rolled stock, the sheet must not have peeling, and must also meet the requirements of quality control of painting, if the sheet is coated.
◆ To prevent impact on the quality of rolled steel, the sheet must not have galvanized peeling, and must also comply with the quality control requirements of galvanized steel, if the sheet has a zinc coating.
9. The working scheme
10. Components of the supplied machine
1 Guide device
1 The whole machine as a single set
2Manual tool
3 Sheet metal stamping device
4 Power Train System
5 Hydraulic guillotine shears